Sorted by equipment type. Open any clip for the specification context and the questions buyers usually ask.
No More Supplier Delays: HAMAC Self-loading Mixer and Pump Revolution in PeruProject cases
Reliable Pumping in Any Terrain | HAMAC Crawler Concrete Pump Delivered to BelarusProject cases
Shipping HAMAC HZM35 Dry Concrete Batching Plant to Nicaragua | 2026 DeliveryProject cases
Peruvian Customer Converts 50 Trailer Pump into Vehicle-Mounted PumpProject cases
Peruvian Customer Refits 50 Trailer Pumps as Vehicle PumpsProject cases
DHBT40 Electric Concrete Pump Built in KenyaProject cases
HAMAC Concrete Mixer with Pump Working in PeruProject cases
How a Self-Loading Concrete Mixer Pours Concrete | HAMAC in PeruProject cases
HAMAC Self-Loading Concrete Mixer Working in BoliviaProject cases
HAMAC 3.5 m3 Self-Loading Concrete Mixer Working in KenyaProject cases
HAMAC 30 m Pumpcrete Truck Working in the PhilippinesProject cases
4.0 m3 Self-Loading Concrete Mixer Working in PeruProject cases
Self-Loading Mixer and Diesel Concrete Pump Working Together in South AmericaProject cases
HMC350 3.5 m3 Self-Loading Concrete Mixer Delivered to ClientProject cases
Electrical Concrete Mixer with Pump Delivered to KenyaProject cases
Diesel Concrete Pump and Diesel Mixer Working Together in CameroonProject cases
Mezcladora de Concreto con Bomba Trabajando en Piura, PeruProject cases
Self-Loading Transit Mixer in Ghana, Supplied by HAMACProject cases
Self-Loading Concrete Mixer 3.5 m3 Shipped to GhanaProject cases
DHBT50 Concrete Pump in Lima, PeruProject cases
HBT15 Concrete Mixer with Pump Working in MyanmarProject casesQuestions buyers ask
How long does delivery take after the deposit?
Standard models leave the factory in 15 to 25 working days. Custom configurations, including special voltages, colours or additional silos, usually need 30 to 45 days. Sea freight adds transit time depending on the destination port.
Who installs the machine on site?
Mobile plants, mixers and pumps are commissioned with remote guidance and a video walkthrough. Stationary plants and crushing lines usually include an engineer for installation and operator training, arranged with the order.
Are spare parts available locally?
Fast-moving parts such as filters, wear plates, pumping pistons and screen mesh are kept in the Zhengzhou warehouse and shipped by air. Regional partners in Peru and the Philippines hold a smaller stock for common models.
More equipment videos
Need a configuration for your project?
Tell us the material, output and site conditions. The engineering team will propose the machine size and layout.