Global Project Cases

DHBT50 Concrete Pump in Lima, Peru

Filmed by the HAMAC team, this clip shows the Peru working rather than a studio render, so the cycle, the access and the finish can be judged at real scale.

Home/Videos/Global Project Cases/DHBT50 Concrete Pump in Lima, Peru
Global Project Cases Peru / Lima Watch on YouTube

What this video shows

  • Spare parts and service support available in the region
  • What the customer ordered and why that configuration was chosen
  • Site conditions the machine has to cope with, including access and power

Why it matters on site

The DHBT50 raises trailer pump output to about 50 m3/h with higher pressure for long or high-rise lines. Machines delivered and working in Peru, Kenya, Ghana, Bolivia, Cameroon, Myanmar, the Philippines, Belarus, Nicaragua and other markets. Each clip shows real site conditions: access roads, power supply, material and the way local operators use the equipment. Buyers usually want to see how the machine behaves under load before they commit to a configuration, and footage answers questions that a specification sheet cannot.

Watch the sequence from set-up to discharge. Pay attention to how the operator controls the pour, how much space the machine needs around it, and what the crew does between cycles. Those details usually decide whether a model fits a site as well in practice as it does on paper.

At a glance

DeliveryContainer or flat rack, depending on machine size
CommissioningRemote guidance or on-site engineer
DocumentationManual, parts book and wiring diagram in English
SupportSpare parts shipped from Zhengzhou warehouse
Equipment shownPeru / Lima
Filmed atLima

Questions buyers ask

Who installs the machine on site?

Mobile plants, mixers and pumps are commissioned with remote guidance and a video walkthrough. Stationary plants and crushing lines usually include an engineer for installation and operator training, arranged with the order.

Are spare parts available locally?

Fast-moving parts such as filters, wear plates, pumping pistons and screen mesh are kept in the Zhengzhou warehouse and shipped by air. Regional partners in Peru and the Philippines hold a smaller stock for common models.

How long does delivery take after the deposit?

Standard models leave the factory in 15 to 25 working days. Custom configurations, including special voltages, colours or additional silos, usually need 30 to 45 days. Sea freight adds transit time depending on the destination port.

Want to see this machine in person?

Factory visits in Zhengzhou and reference sites in your region can be arranged before you order.