Video library

Global Project Cases

Machines delivered and working in Peru, Kenya, Ghana, Bolivia, Cameroon, Myanmar, the Philippines, Belarus, Nicaragua and other markets. Each clip shows real site conditions: access roads, power supply, material and the way local operators use the equipment.

Home/Videos/Global Project Cases
21 videos in this group

Sorted by equipment type. Open any clip for the specification context and the questions buyers usually ask.

No More Supplier Delays: HAMAC Self-loading Mixer and Pump Revolution in PeruNo More Supplier Delays: HAMAC Self-loading Mixer and Pump Revolution in PeruProject casesReliable Pumping in Any Terrain | HAMAC Crawler Concrete Pump Delivered to BelarusReliable Pumping in Any Terrain | HAMAC Crawler Concrete Pump Delivered to BelarusProject casesShipping HAMAC HZM35 Dry Concrete Batching Plant to Nicaragua | 2026 DeliveryShipping HAMAC HZM35 Dry Concrete Batching Plant to Nicaragua | 2026 DeliveryProject casesPeruvian Customer Converts 50 Trailer Pump into Vehicle-Mounted PumpPeruvian Customer Converts 50 Trailer Pump into Vehicle-Mounted PumpProject casesPeruvian Customer Refits 50 Trailer Pumps as Vehicle PumpsPeruvian Customer Refits 50 Trailer Pumps as Vehicle PumpsProject casesDHBT40 Electric Concrete Pump Built in KenyaDHBT40 Electric Concrete Pump Built in KenyaProject casesHAMAC Concrete Mixer with Pump Working in PeruHAMAC Concrete Mixer with Pump Working in PeruProject casesHow a Self-Loading Concrete Mixer Pours Concrete | HAMAC in PeruHow a Self-Loading Concrete Mixer Pours Concrete | HAMAC in PeruProject casesHAMAC Self-Loading Concrete Mixer Working in BoliviaHAMAC Self-Loading Concrete Mixer Working in BoliviaProject casesHAMAC 3.5 m3 Self-Loading Concrete Mixer Working in KenyaHAMAC 3.5 m3 Self-Loading Concrete Mixer Working in KenyaProject casesHAMAC 30 m Pumpcrete Truck Working in the PhilippinesHAMAC 30 m Pumpcrete Truck Working in the PhilippinesProject cases4.0 m3 Self-Loading Concrete Mixer Working in Peru4.0 m3 Self-Loading Concrete Mixer Working in PeruProject casesSelf-Loading Mixer and Diesel Concrete Pump Working Together in South AmericaSelf-Loading Mixer and Diesel Concrete Pump Working Together in South AmericaProject casesHMC350 3.5 m3 Self-Loading Concrete Mixer Delivered to ClientHMC350 3.5 m3 Self-Loading Concrete Mixer Delivered to ClientProject casesElectrical Concrete Mixer with Pump Delivered to KenyaElectrical Concrete Mixer with Pump Delivered to KenyaProject casesDiesel Concrete Pump and Diesel Mixer Working Together in CameroonDiesel Concrete Pump and Diesel Mixer Working Together in CameroonProject casesMezcladora de Concreto con Bomba Trabajando en Piura, PeruMezcladora de Concreto con Bomba Trabajando en Piura, PeruProject casesSelf-Loading Transit Mixer in Ghana, Supplied by HAMACSelf-Loading Transit Mixer in Ghana, Supplied by HAMACProject casesSelf-Loading Concrete Mixer 3.5 m3 Shipped to GhanaSelf-Loading Concrete Mixer 3.5 m3 Shipped to GhanaProject casesDHBT50 Concrete Pump in Lima, PeruDHBT50 Concrete Pump in Lima, PeruProject casesHBT15 Concrete Mixer with Pump Working in MyanmarHBT15 Concrete Mixer with Pump Working in MyanmarProject cases
Before you specify

Questions buyers ask

How long does delivery take after the deposit?

Standard models leave the factory in 15 to 25 working days. Custom configurations, including special voltages, colours or additional silos, usually need 30 to 45 days. Sea freight adds transit time depending on the destination port.

Who installs the machine on site?

Mobile plants, mixers and pumps are commissioned with remote guidance and a video walkthrough. Stationary plants and crushing lines usually include an engineer for installation and operator training, arranged with the order.

Are spare parts available locally?

Fast-moving parts such as filters, wear plates, pumping pistons and screen mesh are kept in the Zhengzhou warehouse and shipped by air. Regional partners in Peru and the Philippines hold a smaller stock for common models.

Need a configuration for your project?

Tell us the material, output and site conditions. The engineering team will propose the machine size and layout.