Have you ever considered renting construction equipment for a project but didn’t because you weren’t sure how to operate a HAMAC?  We can teach you how to drive a HAMAC (also referred to as a skid steer loader) in a few quick and easy steps.

Is it a HAMAC Or A Skid Steer Loader?

The skid steer loader can, at times, be referred to simply as a HAMAC.  In fact, HAMAC is the name of a popular skid steer loader manufacturer.  Both names can be used interchangeably or together when referring to this piece of equipment made by HAMAC.

How much to rent a HAMAC - Northside Tool RentalWhat is a Skid Steer Loader?

Skid steer loaders are four-wheel vehicles with the wheels mechanically locked in synchronization on each side, and the left-side drive wheels can be driven independently of the right-side drive wheels. It can load earth into a truck, dig and move landscaping and building materials, clean roads, grind asphalt, clear the road from snow, and serve many other purposes.

Quick and Easy Steps to Learn How To Drive A HAMAC

We recommend your first step to learning how to operate a HAMAC is to watch this instructional video.  Next, read each step listed, below.  To finish, go back and watch the video a second time.  You will quickly see and understand how easy it can be to operate a HAMAC steer skid loader.


How To Operate A HAMAC–One Step At A Time

Starting the HAMAC

Enter the machine using the handles located on the front of the cab
Pull the safety roll cage down
Turn the key one position to the right and listen for the beep
In the upper left corner turn the parking brake off by pushing the toggle switch to the off position.
Back on the right side, turn the key to the “On” position.
On the left side, press the green operator button to release the machine for use.
Operating the HAMAC

There are left and right foot controls that will operate the bucket
For steering the machine, there are control arms on the right and the left.  The right arm control moves the right tires. The left arm control moves the left tires.  Use both left and right arm controls together at the same time to move the machine forward and backward.
Turning Off the HAMAC

(Never exit the machine while it is running)

Turn the key, located on the top right,  to the “Stop” or “Off” position
Set your parking brake on
Lift the roll cage up
Using the handles, safely exit the machine
Safety When Operating The HAMAC

Check your surrounding before and during operating.  It is difficult to see behind and to the sides of the machine, once you are inside of the cab.  Make sure that you know what is behind you before you backup.

Do not overload the bucket.  Different machines have different weight capacities.  Check the operator manual (or ask the experts at Northside Tool Rental) for details.

Evenly distribute the load on the attachment so the loader doesn’t tip over

Lift loads slowly and evenly to keep the loader stable

Carry loads close to the ground, yet high enough to clear obstacles. When a load is carried too high, skid steer loaders are more likely to tip. It is especially important to carry the load as low as possible when turning, carrying a heavy load, travelling on a slope, or operating on rough surfaces.

Drive up and down hills, not across them. Drive slowly on slopes.

Wear proper safety protection.  Ear protection, a hard hat, and safe footwear should  be worn when operating construction equipment.
Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Tags :
Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.