Product Range & Equipment

QT5-20 Automatic Block Making Machine

Filmed by the HAMAC team, this clip shows the QT5-20 working rather than a studio render, so the cycle, the access and the finish can be judged at real scale.

Home/Videos/Product Range & Equipment/QT5-20 Automatic Block Making Machine
Product Range & Equipment QT5-20 Watch on YouTube

What this video shows

  • Cycle time and the output per shift under normal operation
  • Raw material requirements: cement, sand, aggregate and water
  • Layout and area needed for a complete production line

Why it matters on site

The QT5-20 runs a faster cycle than the QT4-15 and suits higher-volume block production. Block machines, precast production lines, shotcrete units, sweeping and support equipment shown in the workshop and in production. These clips cover the machines that sit around a concrete plant rather than the plant itself. Buyers usually want to see how the machine behaves under load before they commit to a configuration, and footage answers questions that a specification sheet cannot.

Watch the sequence from set-up to discharge. Pay attention to how the operator controls the pour, how much space the machine needs around it, and what the crew does between cycles. Those details usually decide whether a model fits a site as well in practice as it does on paper.

At a glance

CategoryBlock, precast, shotcrete and support equipment
OutputDepends on mould and cycle time
InstallationFoundation drawing supplied with the order
TrainingOn-site or remote, depending on the machine
Equipment shownQT5-20
Filmed atWorkshop / customer site

Questions buyers ask

How much space does a precast line need?

A pole or pipe line needs a production hall long enough for the moulds plus a curing area of similar length. Plan for at least 60 m of building length for utility pole production.

What is the payback period for a block machine?

It depends on local block prices and utilisation. A QT4-15 running two shifts in a market with steady demand typically pays back within 12 to 18 months, assuming the raw material supply and curing area are in place.

Do I need a batching plant for a block production line?

Not necessarily a full plant, but you need consistent proportioning. Many customers start with a batching machine and a pan mixer, then add a batching plant when volume grows.

Want to see this machine in person?

Factory visits in Zhengzhou and reference sites in your region can be arranged before you order.