Concrete Batching Plants

Dry Batch Concrete Batching Plant in Operation

Filmed by the HAMAC team, this clip shows the Dry batch plant working rather than a studio render, so the cycle, the access and the finish can be judged at real scale.

Home/Videos/Concrete Batching Plants/Dry Batch Concrete Batching Plant in Operation
Concrete Batching Plants Dry batch plant Watch on YouTube

What this video shows

  • Truck loading height, ramp access and traffic flow on a working site
  • Foundation, power supply and water requirements before installation
  • Plant layout and the space needed around the aggregate hopper and cement silos

Why it matters on site

Stationary, mobile and dry-batch concrete batching plants filmed in the workshop and on customer sites. Aggregate feeding, cement silo dosing, weighing, mixing and control-system behaviour are shown at real production rates rather than in a studio. Buyers usually want to see how the machine behaves under load before they commit to a configuration, and footage answers questions that a specification sheet cannot.

Watch the sequence from set-up to discharge. Pay attention to how the operator controls the pour, how much space the machine needs around it, and what the crew does between cycles. Those details usually decide whether a model fits a site as well in practice as it does on paper.

At a glance

Plant typeStationary, mobile or dry-batch
Typical output25 to 120 m3/h
Aggregate storage2 to 4 hoppers with belt or skip feeding
ControlSemi-automatic or PLC with batch recording
Equipment shownDry batch plant
Filmed atWorkshop / customer site

Questions buyers ask

What output can I expect from the plant shown?

Output depends on the mixer size, the number of aggregates and the cycle time. A 25 m3/h mobile plant typically completes a batch in 60 to 75 seconds, while a 90 m3/h stationary plant needs a larger mixer and a faster weighing sequence. The video shows the actual cycle on site, which is more reliable than a catalogue figure.

Is a mobile plant accurate enough for structural concrete?

Yes, provided the weighing system is calibrated and the moisture of the sand is measured. Mobile plants use the same load cells and PLC logic as stationary units; the difference is the compact frame and the fast relocation, not the batching accuracy.

How much foundation work is needed?

A mobile plant normally needs a level concrete slab and a hard standing for the loader. A stationary plant needs separate foundations for the mixer, the aggregate bins and the cement silos, plus anchor bolts set to the drawing issued with the layout.

Want to see this machine in person?

Factory visits in Zhengzhou and reference sites in your region can be arranged before you order.