A HAMAC engineered configuration with equipment selection, layout design and on-site commissioning.

Project overview

With the reduction of natural sand resources and the advancement of artificial sand crushing equipment, artificial sand is increasingly favored by people. Hereby, we will explain you a standard artificial sand making production line.

A standard artificial sand making production line

A standard artificial sand making production line

Sand making plant in Dominican

Sand making plant in Dominican

The working flow chart:

The stone is evenly fed by the vibrating feeder to the jaw crusher for coarse crushing. The crushed material enters the cone crusher for secondary crushing. The stones with the suitable size are entered into the vertical shaft impact crusher (sand making machine) for sand making. The materials that do not meet the requirements are returned to the cone crusher for re-crushing to form a closed loop.

The crushed stone coming out of the vertical shaft impact sand making machine are conveyed to the vibrating screen for screening, and the qualified ones are conveyed to the sand washing machine for cleaning. If it does not meet the size requirements, it will be sent to the sand making machine to be crushed again to form a second closed-circuit cycle.

The production line will eventually form a two-stage closed-circuit cycle, and various configurations can also be made according to the specific conditions and needs of customers.

3D Flow Chart of limestone crushing and screening plant

300 tons per artificial sand making and washing plant

150 tons per hour limestone crushing and screening plant

300 tons per artificial sand making and washing plant

Please contact our expert for more solutions. We can provide you with special design based on your requirement.

How HAMAC delivers this line

From material analysis to the first batch — one accountable engineering team.

01

Analyze

Capacity target, raw material and plot dimensions are reviewed by our engineers.

02

Design

You receive a dimensioned layout, equipment schedule and a budget price.

03

Build

Manufacture and pre-assembly testing are completed before shipment.

04

Commission

Installation supervision, operator training and spare parts on site.

Frequently asked questions

Can this configuration be customized?

Yes. Capacity, storage, conveying and packing are sized to your raw material and site. Send your requirements and we return a layout drawing and quotation within 24 hours.

What support is included after purchase?

We provide foundation drawings, installation supervision, commissioning, operator training and spare parts for the first operating season.

Can I visit a similar project?

We can share reference projects in your region and arrange a video call or site visit where access is possible.