The concrete mixer in Zhengzhou Hamac Machinery Co., Ltd. has features of high mixing quality, high-efficiency, easy operation and maintenance, low energy consumption, and the long service life of quick-wear part. Not only it can work independently, but also it can be adopted as the mixer in the concrete batching plant. It can be applied in all kinds of construction sites.
The followings are advices given by Henan Daswell Machinery Co., Ltd. for the purchase and shipping of forced JS concrete mixer.
The purchase:
1. The users should have a good knowledge of the specification and matching scope of the machine.
2. When the machine leaves the factory, bottom rail, crawling ladder, outrigger, guardrail and slouch are in the state of parts and components, and the others are complete machine assembly.
3. JS500 concrete mixer should be transported with cargo truck over 5t and hoisted with crane over 8t.
4. JS750 concrete mixer should be transported with cargo truck over 8t and hoisted with crane over 12t.
The shipping:
1. The location of the center of gravity should not be changed and the steel wire rope should correctly hang over circular lifting hook at the time of hoisting (it is forbidden to hike up the whole machine with the hook on the mixing drum).
2. The folded top rail should be strapped with steel wire rope and the hopper should be fixed with shotpin during the process of shipping concrete mixer.
Need help applying this to your project?
Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.
Questions about this topic
How do I choose batching plant capacity?
Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.
Which mixer type should I choose for my concrete?
Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.
How often should wear parts be replaced?
Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.
Can the plant be upgraded later?
Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.