Methods to Avoid Risks for Concrete Mixing Plants

Home/ News/ Product Knowledge/ Article
Product Knowledge Editorial review by HAMAC

At present,with the development of construction industry and the renovation of urban, concrete industry takes on very good prospects. However, a lot of risks are hidden behind the prospects. We have to face that more concrete mixing are built and consequently glut appears. How should we do to avoid these risks and create a better future?

Firstly, we must guarantee that the raw material suppliers must be reliable so that we have sufficient supply of material. It is necessary we keep touch with one or more suppliers in case of the shortage of raw material. Sometimes, shortage happens when we have only one supplier, which leads to urgency to find a new partner.

Secondly, concrete mixing plants should meet the requirements of nation’s polices. Our country has always advocated scientific development to support sustainable development and the process of “3 waste” so that we can reduce the pollution to environment. Besides, concrete mixing plants should constantly improve their level of science and technology to make recycling and green production.

In addition, the management should be kept up with. Many large companies bankrupt because of bad management and broken capital chain.

Configuration notes for batching plant

Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging. In practice, the delivered scope for this type of work usually includes:

  • twin-shaft compulsory mixer sized to the rated output
  • aggregate batching machine with 3 to 4 hoppers and load-cell weighing
  • cement silos with screw conveyors and butterfly valves
  • PLC control cabin with automatic and manual operation modes

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
  • verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
  • check steel plate thickness of the mixer shell and the batching hoppers
  • ask which brand of load cells, reducers and pneumatic valves is used
  • confirm the control system supports recipe storage and production reports

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Tags :
Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.