How to replace the bucket?

Home/ News/ Earth-moving Machines/ Article
Earth-moving Machines Editorial review by HAMAC
To replace the bucket is actually to remove the stick pin and the connecting rod bucket cylinder pin, remove the originally used bucket, and then use the stick pin and connecting rod pin of other buckets or working devices with the bucket. Connecting the rod and the connecting rod is the process of installing the arm pin and the connecting rod pin. The matters needing attention in the process of replacing the bucket are as follows:

(1) When hitting the pin with a hammer, metal shavings may fly into the eyes and cause serious injury. When performing this operation, always wear goggles, helmets, gloves and other protective equipment.

(2) When unloading the bucket, place the bucket steadily.

(3) Hit the pin shaft hard, the pin shaft may fly out and injure people around. Therefore, before hitting the pin again, the safety of the people around should be ensured.

(4) When disassembling the overhead shaft, pay special attention not to stand under the bucket, and do not put your feet or any part of your body under the bucket. When disassembling or installing the pin, for the sake of safety, clarify the signals with each other and work carefully with the personnel involved in the connection work.

Configuration notes for pump

Pumping height and pipeline length reduce achievable output. A pump rated at 60 m³ per hour at ground level will deliver considerably less at 100 metres of horizontal pipeline. In practice, the delivered scope for this type of work usually includes:

  • hydraulic pump unit with variable displacement control
  • S-valve or gate valve with hardened wear plates and cutting ring
  • delivery pipeline sized to the concrete mix and vertical lift
  • outrigger frame and stabilisers for safe placement

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the output and pressure figures are quoted at the required horizontal and vertical distance
  • check the maximum aggregate size the pump handles with your mix design
  • verify the pipeline diameter matches the slump and aggregate of your concrete
  • ask about wear plate and cutting ring life under your aggregate type
  • confirm after-sales support and spare parts for the hydraulic system

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.