The pump is owned by company Siam Civil Supply Limited Partnership. They are a local construction company, the pump is used for their daily job.
How the pump will work? First the pump has a hopper, it will receive ready mix concrete from transit mixer or JZR concrete diesel mixer or self loading diesel concrete mixer or mixer on concrete batching plant or boom pump, any mixers basically, then by the force given by the concrete cylinder, the concrete inside the hopper will be sucked in and then out through the connected concrete pipe to anywhere you want the concrete to be, it could be a roof top, a higher floor, or a far away horizontal distance, all is fine, so you can complete your job.
Configuration notes for batching plant
Output is a function of mixer cycle time, not only mixer volume. A 1.5 m³ mixer running six batches per hour delivers more concrete than a 2 m³ mixer running four batches per hour with slow charging and discharging. In practice, the delivered scope for this type of work usually includes:
- twin-shaft compulsory mixer sized to the rated output
- aggregate batching machine with 3 to 4 hoppers and load-cell weighing
- cement silos with screw conveyors and butterfly valves
- PLC control cabin with automatic and manual operation modes
Site and operating conditions
Equipment working in Thailand has to deal with high humidity and heavy seasonal rain, which makes corrosion protection, electrical enclosure sealing and drainage around the foundation important details rather than afterthoughts. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the rated output is measured with dry aggregate, not in ideal laboratory conditions
- verify the weighing accuracy tolerance stated in the contract, typically plus or minus one percent
- check steel plate thickness of the mixer shell and the batching hoppers
- ask which brand of load cells, reducers and pneumatic valves is used
- confirm the control system supports recipe storage and production reports
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.