Earth-moving Machines

Clever use of bucket is the key to reducing wear

Home/ News/ Earth-moving Machines/ Article
Earth-moving Machines Editorial review by HAMAC

Using buckets to stay away from violent operations is the key to improving the efficiency of excavator buckets and reducing bucket wear. Therefore, using buckets skillfully is a good method. So how to use buckets skillfully to reduce equipment wear, and what skills can be learned ?

When digging into the soil, the bucket teeth of the bucket should pay attention to some inclination angles. Do not directly enter the soil at a right angle. Like a shovel, reaching a certain angle can reduce the inclination pressure and reduce the direct wear on the bucket teeth. For harder deterioration, it is best to loosen the soil, cut the soil layer with three bucket teeth, so that they can be dug out together to achieve a timely bucket to achieve a better bucket use effect.

When loading the truck, pay attention to the bucket capacity, not too much, which will cause a serious load on the overall bucket. At the same time, pay attention to the force of the bucket stick to avoid the situation that the bucket capacity is too large and the arm will be broken directly. At the same time, pay attention to the uniform speed. Carry, avoid the excessive force generated by the gyration, resulting in the occurrence of various materials scattered.

Pay attention to the maintenance of the bucket when the excavator is not used. Good maintenance habits are one of the effective measures to increase the service life of the bucket and reduce the wear of the product. Therefore, it is necessary to clean in place at ordinary times, and it is necessary to find cracks in the bucket teeth. Take necessary measures in time.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How do I choose batching plant capacity?

Estimate the concrete volume per day, then divide by the effective working hours. Add 20 to 30 percent headroom for peak demand. A 35 m³/h plant suits small contractors; 50 to 75 m³/h suits commercial supply; 90 m³/h and above suits large projects.

Which mixer type should I choose for my concrete?

Twin-shaft compulsory mixers are the default for commercial concrete because of short mixing cycles and uniform output. Planetary mixers suit high-grade or special mixes, and drum mixers suit smaller, simpler operations.

How often should wear parts be replaced?

Mixer blades and liners are inspected weekly and normally replaced every 6 to 12 months depending on abrasive content. Belt scrapers, screen meshes and pump wear plates follow the same inspection rhythm.

Can the plant be upgraded later?

Yes. Modular batching plants allow additional silos, a larger mixer or an upgraded control system to be added later without replacing the whole structure.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.

Keep reading

Related articles

All news

Turn this knowledge into a working plant

HAMAC engineers translate your output target, material and site layout into a concrete or aggregate production configuration.