18th , January, 2022, HAMAC disassembled the wheels of a WZ40-28 backhoe loader and put it in a 40ft containter. This customer is a big fan of HAMAC and has purchased our products many times. This is the 4th order he placed since 2020.
The sea freight remains very high, our client has to pay high freight if loading by ro-ro ships. In comparison, loading in a 40ft container costs less. In order to help customers save some freight, we removed all the wheels of the backhoe loader and installed craft wheels to facilitate loading, and also facilitate customers to drive it out of the container.
In the construction of infrastructure, the backhoe wheel loader always plays an important role. It has a bucket of 1m3 at the front end, which can load and unload various materials. The rear end is equipped with a 0.3m3 bucket, which can excavate at a maximum depth of 4.5 meters, and the digging arm can be rotated at 190 degrees, which is convenient for multi-directional operations. The 100hp Cummins engine allows the machine itself to obtain enough power. In addition, the engine parts are easy to buy locally, which also attracts our client.
Configuration notes for equipment
Equipment selection starts with the material and the required daily output. Machine size alone is a poor basis for comparison between suppliers. In practice, the delivered scope for this type of work usually includes:
- correctly sized main machine for the required output
- material feeding and conveying system
- control system with manual and automatic modes
- wear parts package matched to the material
Site and operating conditions
Equipment working in Ghana has to deal with high humidity and heavy seasonal rain, which makes corrosion protection, electrical enclosure sealing and drainage around the foundation important details rather than afterthoughts. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the quoted capacity is achievable with your actual material
- check the core component brands and the wear part material
- verify the power supply and foundation requirements on your site
- ask what commissioning and operator training is included
- confirm spare parts availability and typical delivery time
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.