Company News

HPS10 hydraulic Shortcrete Pump and DJBT40 Concrete Mixer With Pump Shipment to Antigua

Home/ News/ Company News/ Article
Company News Editorial review by HAMAC

On January 05, 2022, a HPS10 hydraulic shortcrete pump and a DJBT40 concrete mixer with pump were loaded in a 40ft high container and sent to Antigua.

HPS10 hydraulic shortcrete pump is a hydraulic pumping wet spraying machine, which can be used for spraying, filling, grouting, pumping and other construction. The injection volume is continuously adjusted, and the injection speed can be adjusted freely. The amount of additive added is continuously adjustable. The whole system of the wet spraying machine includes one wet spraying machine, 100 meters of steel pipe, 20 meters of flexible hose, two spray guns (one wet spray nozzle, one anti-fog nozzle), one air compressor, and one gas storage tank.

DJBT40 diesel concrete mixer with pump integrates mixing and pumping, which is convenient for customers to mix materials on site and deliver the ready mixed concrete directly, which greatly improves work efficiency. We use the main oil pump imported from South Korea Kawasaki, the main oil cylinder and swing oil cylinder from Hunan Xieli, the Manuli oil pipe imported from Italy, the hydraulic control valve from Taiwan Yuken Company, and the intermediate relay from Japan Omron to ensure the durability of the equipment.

Configuration notes for pump

Pumping height and pipeline length reduce achievable output. A pump rated at 60 m³ per hour at ground level will deliver considerably less at 100 metres of horizontal pipeline. In practice, the delivered scope for this type of work usually includes:

  • hydraulic pump unit with variable displacement control
  • S-valve or gate valve with hardened wear plates and cutting ring
  • delivery pipeline sized to the concrete mix and vertical lift
  • outrigger frame and stabilisers for safe placement

Site and operating conditions

Equipment working in the destination market has to deal with local material grading, power supply stability and the availability of skilled operators, all of which influence the final configuration more than the catalogue rating does. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.

What buyers should check before ordering

  • confirm the output and pressure figures are quoted at the required horizontal and vertical distance
  • check the maximum aggregate size the pump handles with your mix design
  • verify the pipeline diameter matches the slump and aggregate of your concrete
  • ask about wear plate and cutting ring life under your aggregate type
  • confirm after-sales support and spare parts for the hydraulic system

Key takeaways

  • Base the selection on daily output and actual material, not on a model number.
  • Confirm the quoted capacity matches your material and site conditions.
  • Plan wear parts and a spare parts kit from the first year of operation.

HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.

Need help applying this to your project?

Send your material type, target output and site conditions to HAMAC engineers. You will receive a practical equipment configuration and a clear quotation, normally within one working day.

Questions about this topic

How long does production take after an order is confirmed?

Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.

Can we visit the factory before placing an order?

Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.

What is included in the delivery scope?

A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.

How is the equipment installed overseas?

HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.

HAMAC Machinery Editorial Team

Written and reviewed by engineers and sales specialists who configure concrete batching plants, crushers, mixers and pumps for projects in more than 180 countries. Content is based on factory testing data and field feedback from delivered equipment.