One set of concrete pole making plant was delivered to the Philippines on 30th, March, 2022 by HAMAC. The complete concrete pole manufacturing plant includes aggregate batcher and concrete mixer to produce the concrete, rotary concrete feeder, concrete molds of different length, spinning machine, steam boiler, overhead cranes, automatic cage welding machine etc.
They are loaded into 4 containers and be delivered to Manila north port. It will arrive to Manila soon.
The capacity of this concrete pole making machine is 12 pcs per day. The client will produce more by adding more molds after the workers are skilled and experienced.
There is no lowest price, only lower price. You get what you pay for. We hope you are looking for the perfect working performance of the equipment, not the low-priced inferior goods. HAMAC only provide our clients with high quality machines. Wish have a cooperation with you in the future.
Configuration notes for mixer
A self-loading mixer removes the need for a separate batching plant and wheel loader on small and remote sites, but the batch cycle is longer, so daily output depends on travel distance on site. In practice, the delivered scope for this type of work usually includes:
- drum with hydraulic drive and reversible discharge
- front loading shovel with hydraulic lifting and tipping
- four-wheel-drive chassis rated for rough site roads
- weighing and water dosing system for consistent batch quality
Site and operating conditions
Equipment working in Philippines has to deal with high humidity and heavy seasonal rain, which makes corrosion protection, electrical enclosure sealing and drainage around the foundation important details rather than afterthoughts. These points are reviewed during the technical clarification stage, because they change foundation design, electrical protection and the maintenance schedule.
What buyers should check before ordering
- confirm the drum volume and the actual mixed output per batch
- check whether the loading shovel can reach the aggregate stockpile height on your site
- verify the chassis and axle rating for the road conditions you will use
- ask about water dosing accuracy and how the operator sets the mix ratio
- confirm spare parts availability for hydraulic pumps and drum seals
Key takeaways
- Base the selection on daily output and actual material, not on a model number.
- Confirm the quoted capacity matches your material and site conditions.
- Plan wear parts and a spare parts kit from the first year of operation.
HAMAC can review your requirement and propose a comparable configuration with a clear scope, schedule and support plan.
Questions about this topic
How long does production take after an order is confirmed?
Standard concrete batching plants are normally ready for shipment in 20 to 30 working days. Custom configurations with non-standard silos, aggregate bins or control systems may require 35 to 45 working days. The exact schedule is confirmed in the sales contract.
Can we visit the factory before placing an order?
Yes. HAMAC welcomes factory visits in Zhengzhou, China. Visitors can inspect the fabrication workshop, assembly line and testing area, and review reference machines before signing.
What is included in the delivery scope?
A typical delivery includes the main plant, mixer, batching machine, cement silos, screw conveyors, control cabin and connecting chutes. Foundation bolts, wear plates and a spare parts kit are also supplied.
How is the equipment installed overseas?
HAMAC provides foundation drawings, a detailed installation manual and remote video guidance. For larger plants an engineer can be dispatched to site to supervise installation and commissioning.